4 documents
The Document Library
Search everything published — by keyword, or by narrowing the filters.
- Press ReleasesSep 10, 2026
Framework Agreement Signed for Smart Metering Rollout
A multi-year agreement covering ultrasonic metering and network telemetry.
- VideosSep 10, 2026
SX-200 Installation Walkthrough
Rail system fitting, cable routing and first-start checks.
- ArticlesTechnical ArticlesSep 10, 2026
Reducing Non-Revenue Water with District Metering
District metered areas turn an unmanageable network-wide loss figure into a set of tractable local problems.
- ArticlesTechnical ArticlesSep 10, 2026
Cutting Aeration Energy in Activated-Sludge Plants
Aeration typically consumes 50–60% of a treatment plant’s electricity. Most of that is recoverable without new blowers.