Running the process: O&M, control, distribution, performance and risk. Equipment design belongs elsewhere.
Ten checks that prevent most emergency callouts.
Aeration typically consumes 50–60% of a treatment plant’s electricity. Most of that is recoverable without new blowers.
Every curve is measured on clean water at a fixed speed. Here is what suction conditions, wear rings and a worn impeller do to it.
What was specified, what we found on site, and the four changes that made the difference.
The one number worth putting on a wall, and the three ways it gets reported wrongly.
What KPIs covers within Performance & Risk, the questions it answers in practice, and where to read next.
What Optimisation covers within Performance & Risk, the questions it answers in practice, and where to read next.
Hard-won lessons from commissioning water treatment plants in the GCC and Levant — what goes wrong, why, and what to specify differently next time.