- Case study· Processes & OperationsRiyadh Lift Station ModernisationReplacing 14 ageing lift-station pumps cut blockage callouts by 71% and energy use by 19%.3 Nov 2026See the case
- Case study· Science & HealthPFAS Removal via Granular Activated Carbon — Dutch Municipal WTPFull-scale GAC installation reducing PFAS below EU Drinking Water Directive limits at a 45,000 m³/day plant after sand-filter modification.8 Jul 2024See the case
- Case study· Water TechnologiesRO Plant Capacity Expansion — 50 MLD Upgrade in OmanHow a staged membrane upgrade cut specific energy consumption by 18 % while expanding output from 30 to 50 MLD at the Al-Ghubrah seawater RO facility.10 Mar 2024See the case