## Background Al-Ghubrah desalination plant, Oman's oldest large-scale SWRO facility, was commissioned in 2009 with a design capacity of 30 MLD. By 2022 demand had grown to require 50 MLD, and the site infrastructure — intake, pre-treatment, high-pressure pumping — was already in place. ## Challenge Expanding capacity inside the existing footprint without a full plant outage, while meeting Oman's 2030 energy-efficiency targets (≤ 3.5 kWh/m³ net) and the regulator's continuous supply obligation. ## Approach A phased membrane replacement programme swapped legacy 8" elements for high-rejection low-energy elements across 12 pressure vessel trains during planned maintenance windows. Isobaric energy-recovery devices replaced the old Pelton-wheel turbines on six trains. ## Results - Output raised from 30 to 50 MLD (66 % increase) - Specific energy consumption reduced from 4.1 to 3.37 kWh/m³ - No unplanned outage during the upgrade programme - Payback on membrane investment: 28 months

The challenge

Expand capacity from 30 to 50 MLD inside an existing footprint without a full plant outage, while meeting national energy-efficiency targets.

The solution

Twelve pressure-vessel trains were retubed sequentially with new-generation 8" elements rated at 99.75 % NaCl rejection and 15 % lower feed pressure. Pelton turbines on six trains were replaced with isobaric ERDs raising energy recovery from 41 % to 53 %.

The results

Capacity +66 %, specific energy −18 %, no unplanned supply interruption, 28-month payback on capital.

Keys to success

Phased execution during planned maintenance windows; selection of high-rejection low-energy membrane elements; isobaric energy-recovery device retrofit.