2 items
Case Studies
- Case study· Processes & OperationsRiyadh Lift Station ModernisationReplacing 14 ageing lift-station pumps cut blockage callouts by 71% and energy use by 19%.3 Nov 2026See the case
- Case study· Science & HealthPFAS Removal via Granular Activated Carbon — Dutch Municipal WTPFull-scale GAC installation reducing PFAS below EU Drinking Water Directive limits at a 45,000 m³/day plant after sand-filter modification.8 Jul 2024See the case