Case Studies
SectionScience & HealthSectionprocesses-operationsSectionWater SystemsYear2024Available inالعربيةClear all
- Case study· Science & HealthPFAS Removal via Granular Activated Carbon — Dutch Municipal WTPFull-scale GAC installation reducing PFAS below EU Drinking Water Directive limits at a 45,000 m³/day plant after sand-filter modification.8 Jul 2024See the case
- Case study· Water SystemsAquifer Storage and Recovery for Demand Levelling — RiyadhPiloting ASR in a brackish sandstone aquifer to buffer treated water supply against peak summer demand, reducing peak-day desalination throughput by 12 %.20 May 2024See the case